Park To Bay Link

*Hover on a thumbnail to see a larger picture
 

Park to Bay Link with general contractor Westcoast General was completed in 2007 and is located in downtown San Diego and is an extension of the trolley system. Some of the work completed includes trackways, track paving, decorative sidewalk and exposed aggregate.